D-J Engineering

Self-Audit Supplier Survey

DJEF-SA-SS Rev N · Effective February 25, 2026

Controlled supplier self-audit

Complete the applicable sections

Complete the supplier information below and the applicable survey sections. Fields marked * are required. Select N/A when a question does not apply and explain where requested.

If your company is ISO 9001, AS9100, ISO/IEC 17025 or NADCAP certified, complete Section 5 and attach your certificates. Bell Helicopter Textron approved processors must also complete Section 12.

This form is submitted as one survey. Keep this page open until you receive a confirmation reference. Attachments must be selected again if validation fails.

Supplier information
Quality standards

Up to five PDFs, 5 MB each and 10 MB combined. Certificates are required when you select Yes above. Uploaded documents are accessible to authorized administrators.

Survey progress Only questions in the applicable sections are counted.

Section 4 Quality Systems
1
2
3
4
Section 4.2.3 Document and Data Control
1
2
3
Section 4.2.4 Control of Quality Records
1
2
3
Section 5.0 Management Responsibility
1

If yes, reference your internal procedure numbers in comments.

If no, make comments as to why or when you plan to develop and implement a policy.

2
3
4
5
6
Section 5.1 Supplier Cybersecurity Representation
1
2
3
4
5

See https://www.dc3.mil/missions/dib-cybersecurity/dib-cybersecurity-dcise/ for details on cyber incident reporting.

6

If “Yes” to question 6, please provide:

Self DIBCAC

Section 5.2 Compliance to CMMC, DFARS 252.204-7021

CMMC Level 3 (DIBCAC):

If “Yes”,

Note: If “Conditional Assessment”, POAM must be completed within 180 days.

If “No”, proceed to CMMC Level 2.

CMMC Level 2:

If “Yes”,

OR

OR

Note: If a Conditional Assessment, POAM must be completed within 180 days

If “No”, proceed to CMMC Level 1.

CMMC Level 1 (Self):

Section 6.2.2 Training
1
Section 6.4 Work Environment
Section 7.2 Contract Review
1
2
Section 7.4 Purchase Order Control
1
2
3
4
5
6
7
Section 7.5 Process Control
1
2
3
4
Section 7.5.1 Tooling Control
5
6
7
8

A. Legible and proper Identification of ST; B. Evidence of acceptance of the ST;

Section 7.5.3 Product Identification and Traceability
1
2
Section 7.5.3 Inspection Stamp Control
1
2
Section 7.5.4 Customer Supplied Product
1
Section 7.5.5 Handling, Storage, Packaging, Preservation and Delivery
1
2
3
4
5
6
Section 7.6 Control of Inspection, Measuring, and Test Equipment
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Section 8.2 Inspection and Testing
1
2
3
4
4
5
6
7
8
9
10
11
12
13
14
15
16
Section 8.2.2 Internal Audit Program
1
2
3
Section 8.3 Control of Nonconforming Material
1
2
3
4
5
6
7
Section 8.4 Statistical Techniques
1
Section 8.5.2 Corrective Action
1
2
3
4
5
Section 9 Equal Employment Opportunity / Affirmative Action Program (EEO/AAP)
1
Section 10 Counterfeit Goods

Supplier shall not furnish to DJE, any goods that are “Counterfeit Goods”, defined as

Goods or separately-identifiable items or components that: (i) are an unauthorized copy or substitute of an Original Manufacturer or Original Component manufacturer (collectively, “OEM”) item; (ii) are not traceable to an OEM sufficient to ensure authenticity in OEM design and manufacture.

The supplier shall have a counterfeit detection process that meets the intent of SAE

standard AS5553, Counterfeit Electronic Parts, Avoidance, Detection, Mitigation, and

Disposition, if applicable.

Section 11 Calibration Services

Certified test reports attesting traceability to NIST standards must contain the following as a minimum:

Name of Standard or number and Procedure used, Serial Number of Standard used,

Environmental Conditions, Accuracy of Standard, Deviation of correction, Report serial number, NIST Registry Number, Date Calibrated, Certified Statement by the Lab Personnel Conformance to ISO 10012, ISO 17025, or ANSI/NCSL Z540-3.

Section 12 Controlled Items – Bell Helicopter
1
2